California Mining Claims

California Claim-Staking Guide

A step-by-step guide to staking, recording, and keeping a lode or placer mining claim on federal public land in California: the monument, the notice, the county recorder, BLM, and the yearly filings. It also covers the state rules that can stop you from working a valid claim.

Educational guide only — not legal advice. Gold Monster provides document-preparation assistance and educational information. It is not a law firm. Fees, deadlines, and rules change. Verify everything with the agency before filing. If you have edge cases — association claims, patented ground, split estate, tribal or withdrawn land — consult a mineral title professional or attorney.

Last checked: California statutes read 2026-10-05 and again 2026-10-29; BLM fees confirmed 2026-10-16 and again on the BLM fees page 2026-11-16.

Who this is for, and is the land open?

This guide is for a locator staking a lode or placer claim on federal public land in California. Do the free land check before you spend anything.

For a lode claim, PRC § 3900 says the locator must be a U.S. citizen or have declared the intention to become one. California does not ask for a citizenship affidavit. The placer section (§ 3902) has no citizenship words, but federal law still applies.

First check: is anyone already on the ground?

  • Existing claim: search MLRS (mlrs.blm.gov) for claims on the ground. Current California serials begin with CA followed by nine digits. Older records may show CAMC.
  • BLM land status: confirm the land is federal public land open to mineral entry. The BLM General Land Office records (glorecords.blm.gov) show land status and withdrawal notations.
  • State land: California school lands and sovereign lands belong to the State Lands Commission, not BLM. They are not open to a federal claim, and a parcel can look clear in BLM records and still be state land. The beds of navigable rivers are generally state land. The Commission has a public map site, but it says the map is not for title or boundary use, so call the Commission before you stake near a river.
  • Withdrawals: withdrawn land is closed to new claims. In California that includes national parks and park preserves in the desert (Death Valley, Joshua Tree, Mojave National Preserve), national monuments whose proclamations withdraw the land from the mining laws (Mojave Trails, Sand to Snow, Castle Mountains, Chuckwalla, Sáttítla Highlands), wilderness, and the bed and bank land of rivers designated “wild.” If you are unsure, ask the BLM California State Office before you stake.

BLM California State Office, 2800 Cottage Way, Suite W1623, Sacramento, CA 95825. 8:30 a.m.–4:30 p.m. Monday–Friday, 916-978-4400.

Read This Before You Buy Equipment

A claim can be perfectly recorded and still not let you use the tools you planned on.

Motorized dredging is banned in California

  • Suction dredging in a river, stream, or lake has been prohibited since 2009 (Fish & Game Code § 5653.1). The state Department of Fish and Wildlife says it is also barred from issuing permits. A valid federal claim does not change that.
  • The ban reaches any “mechanized or motorized system” used to remove or process material from a stream bed, bank, or channel (Fish & Game Code § 5653(g); Water Code § 13172.5). A motorized highbanker or power sluice that processes stream material falls inside that wording. Only nonmotorized recreational mining, such as panning, is carved out.
  • Even by hand, if you will substantially change a stream bed, channel, or bank, Fish & Game Code § 1602 requires you to notify the department first. Ask the department before you dig in a stream.

Digging a larger site needs a county permit

  • Under the Surface Mining and Reclamation Act, you are exempt only if you remove less than 1,000 cubic yards in one location and disturb less than one acre (PRC § 2714(d)). Cross either line and you need a permit, a reclamation plan, and financial assurances from the lead agency, usually the county (PRC §§ 2770, 2728).
  • Surface mining that federal law requires only to protect a claim, meaning assessment work, is also exempt (PRC § 2714(e)).

Federal surface rules

  • On BLM land: exploration that disturbs 5 acres or less needs a notice to BLM 15 days ahead (43 CFR 3809.21). Anything beyond casual use needs a plan in some areas, including California Desert Conservation Area land designated “controlled” or “limited” use (43 CFR 3809.11).
  • On national forest land: a notice of intent is needed for work that might cause significant disturbance. Gold panning, metal detecting, nonmotorized hand sluicing, and battery-operated dry washers are exempt (36 CFR 228.4). The District Ranger decides whether you need a plan.

Lode or placer?

A lode claim covers a vein or lode in rock. California law (PRC § 3901) lets it run up to 1,500 feet along the vein and no more than 300 feet on either side of the centerline. A placer claim covers loose gold in gravel, sand, or other deposits. California locates and records both in one chapter of the Public Resources Code (§§ 3900–3924): lode in §§ 3900–3901, placer in § 3902. BLM charges the maintenance fee per lode claim but per 20 acres for a placer.

Where a U.S. survey covers the land, a placer can be taken by legal subdivision, and then its boundaries need not be staked or monumented (PRC § 3902).

Deadlines at a Glance

The county clock runs from the day you post the notice. The lode monument clock runs from the date of location. California has no map to file.

WhatWhenLaw
Monument at each corner (lode)60 days after the date of location. A placer has no day count in the statute.PRC § 3901; placer § 3902(b)
Record a copy of the notice and your boundary-marking statement with the county recorder90 days after posting the notice. One clock for lode and placer. The statute states no penalty for late recording, so ask the recorder.PRC § 3911
BLM filing and fees90 days after location43 CFR 3833.11
BLM yearly maintenance fee (or Small Miner Waiver)September 1 each year. The first one is the first Sept 1 after the date of location.43 CFR 3830.5, 3834.11, 3835
County affidavit (labor done, or maintenance fee paid)September 30 every year the claim is held, whichever BLM path you tookPRC § 3913

The statute gives 30 days after the federal date. Counting 30 days from September 1 lands on October 1, but Sierra County’s own form says “by September 30.” Plan for September 30 and confirm with your county recorder.

If the affidavit is not recorded in time, the law presumes you meant to abandon the claim at the end of that assessment year, and you carry the burden of proving the work or the fee in any title contest (PRC § 3913(c)(1)).

Step by Step

Work through these in order.

Step 1

Stake and Monument the Claim

60 days (lode)

Build a monument at the point of discovery, and post your notice in or on it (PRC § 3900).

For a lode claim, within 60 days of the date of location, put a monument at each corner. Each one must carry markings that name the corner and the claim (PRC § 3901). For a placer, put a substantial monument at each corner, marked with the corner and the claim name (PRC § 3902(b)).

Only three kinds of monument count (PRC § 3915). Each must stand at least 2 feet above the ground:

  • a wooden post at least 1½ inches across;
  • a mound of stone;
  • a non-perforated, capped metal post or a solid metal rod, at least 1 inch across.

Where steep ground makes it unsafe to put a monument in the right spot, a witness monument can go as close as conditions allow (PRC § 3915).

If you later give up the claim, check PRC § 3915 about removing your monuments. The removal rule is worded in a way that makes its reach unclear, so ask the county recorder.

Cost: your materials and time.

Step 2

Post the Notice of Location

The lode notice (PRC § 3900) states:

  • the name of the lode or claim;
  • your name and current mailing or residence address;
  • the feet claimed along the vein each way from the point of discovery, the width on each side of the claim’s center, and the general course of the vein;
  • the date of location, which is the date you post the notice;
  • the kind of monument used for the discovery and for the corners;
  • a description tying the claim to a natural object or permanent monument.

A placer notice (PRC § 3902) states the claim name, your name and address, the date of location, the feet or acres claimed, and the same natural-object or monument tie.

Knowingly making a false statement on the posted or recorded notice is a misdemeanor (PRC § 3911). Describe only what you did.

Cost: $0.

Step 3

Record With the County Recorder

90 days

Within 90 days after you post the notice, record two things with the recorder of the county where the claim sits (PRC § 3911):

  • A true copy of the posted notice of location.
  • A statement of how the boundaries are marked, and what the markings are. It must also give the section, township, range, and meridian of the U.S. survey the claim sits in.

California requires no location map. Some county forms ask for one anyway: Sierra County’s placer form asks for a USGS topographic map. Ask your recorder what the office wants.

Plumas County says BLM’s own forms do not meet California’s recording requirements, so record California-style documents with the county.

The statute sets the 90 days but states no consequence for a late recording. Record on time. For what a late recording would do, ask the county recorder or a mineral title professional.

Cost: see the Fees section below.

County recorder contacts: find your county recorder’s current address, phone, and fee on the county’s own website, and call before you mail anything. Some counties list only a street address, and one county page (Mendocino) carries a banner against mailed recordings.

Step 4

File With BLM

90 days

File the claim with BLM within 90 days of location (43 CFR 3833.11). The filing office is the BLM California State Office, 2800 Cottage Way, Suite W1623, Sacramento, CA 95825, 916-978-4400 (8:30 a.m.–4:30 p.m. Monday–Friday). The Mother Lode Field Office in El Dorado Hills is a separate office and is not the filing office. MLRS online filing is also available (mlrs.blm.gov).

BLM fees are in the Fees section below. You will receive a BLM serial number, which begins with CA for California claims.

Step 5

Keep It Alive Every Year

Sept 1 and Sept 30

With BLM, by September 1 each year, pick one path. The first annual payment is due on the first September 1 after the date of location.

  • Path A: pay the maintenance fee, $200 per lode claim, or $200 per 20 acres or portion per placer claim.
  • Path B: if you hold 10 or fewer claims nationwide (including related parties), file the Small Miner Waiver, BLM Form 3830-002, with no fee. You then do at least $100 of assessment work per claim during the assessment year.

In a waiver year, BLM also wants an affidavit of assessment work by December 30 (Form 3830-004, $15 per claim). For the claim’s first year, a Notice of Intent to Hold by December 30 replaces it (43 CFR 3835.31(c)). If you paid the fee instead, nothing is due to BLM on that date.

With the county recorder, by September 30 every year, whichever BLM path you took (PRC § 3913). The federal Form 3830-004 does not count for this. The state affidavit is a separate paper. It states, among other things:

  • the claim name and BLM serial number, if any, and where the notice of location was recorded;
  • the section, township, range, and meridian;
  • in a labor year, a description of the work, the value of each item, and the dates;
  • in a fee year, a statement that the maintenance fee has been or will be paid, with the amount and the date;
  • your name and mailing address, and the owner’s;
  • a statement that the claim is held for the valuable mineral in it, and that the required monuments and notices are in place.

Some counties also want the tax collector to certify your county taxes are paid before they will record (PRC § 3914). Plumas and Sierra counties publish that step. Ask your recorder.

Fees

BLM fees, schedule effective Sept 1, 2024, confirmed unchanged on the BLM fees page 2026-11-16.

BLM feeAmountNotes
Processing fee$25Per claim
Location fee$49One-time, per claim
Initial maintenance$200 per lode claim
$200 per 20 acres (or portion) per placer claim
Covers the assessment year you located the claim in

Typical total: a new lode claim is $25 + $49 + $200 = $274.

County and state recording charges

California sets no fixed statewide fee for a claim filing, and no mining-agency fee. What you pay depends on the county, so there is no total in this guide.

  • State law caps the base recording fee at $10 for the first page and $3 for each added page (Gov. Code § 27361). Other statutes let counties add charges on top.
  • Published first-page fees seen before any add-on: Siskiyou $14, Nevada County $15, Sierra $15. Siskiyou’s schedule is dated 2019 and may be out of date.
  • The state’s $75 housing charge (Gov. Code § 27388.1), capped at $225 per transaction per parcel, may apply. Mono, Sierra, and Plumas counties say in their own materials that they add it to notices of location and affidavits. Ask whether your county does.

Confirm the total with your county recorder before you write a check, for both the first recording and the yearly affidavit. Re-check the BLM fees page before every filing.

Where Gold Monster Helps

The Claims Wizard prepares California paperwork for members to review, sign, and file: the notice of location and the statement of boundary markings, with your deadlines tracked. Membership is $9.99 a month, cancel anytime. See membership

Sources

Also see the Nevada claims guide and the Oregon claims guide.