Nevada Mining Claims

Nevada Claim-Staking Guide

A step-by-step guide to staking, recording, and keeping a lode or placer mining claim on federal public land in Nevada: the monument, the notice, the county recorder, BLM, and the yearly filings.

Educational guide only — not legal advice. Gold Monster provides document-preparation assistance and educational information. It is not a law firm. Fees, deadlines, and rules change. Verify everything with the agency before filing. If you have edge cases — association claims, patented ground, split estate, tribal or withdrawn land — consult a mineral title professional or attorney.

Last checked: Nevada statutes read 2026-09-08 and re-fetched 2026-10-29; BLM fees confirmed 2026-10-16.

Who this is for, and is the land open?

This guide is for a locator staking a lode or placer claim on federal public land in Nevada. Do the free land check before you spend anything.

Under NRS 517.010 a locator must be a citizen of the United States, or have legally declared the intention to become one.

First check: is anyone already on the ground?

  • Existing claim: search MLRS (mlrs.blm.gov) for claims on the ground. Nevada serials begin with NV; older paperwork may show NMC.
  • BLM land status: confirm the land is federal public land open to mineral entry. The BLM General Land Office records (glorecords.blm.gov) show land status and withdrawal notations.
  • Withdrawals: withdrawn land is closed to new claims. If you are unsure, ask the BLM Nevada State Office before you stake.

BLM Nevada State Office, 1340 Financial Blvd., Reno, NV 89502. Public Room 8 a.m.–4 p.m. Monday–Friday, 775-861-6500.

Lode or placer?

A lode claim covers a vein or lode in rock. Federal law (30 U.S.C. 23) lets it run up to 1,500 feet along the vein and no more than 300 feet on each side of the middle of the vein. A placer claim covers loose gold in gravel, sand, or other deposits. The two use different Nevada statutes (NRS 517.010–517.050 for lode, 517.090–517.110 for placer), and BLM charges the maintenance fee per lode claim but per 20 acres for a placer.

Deadlines at a Glance

The monument and map clocks start from the day you post the notice. The recording and BLM clocks run from the date of location.

WhatWhenLaw
Monument at each corner60 days after posting the noticeNRS 517.030(1); placer: NRS 517.090
Location map (two copies)90 days after posting the noticeNRS 517.040 (lode), 517.100 (placer)
Certificate of location, recorded with the county recorder90 days after location. Late: location void under state law.NRS 517.050(2) (lode), 517.110 (placer)
BLM filing and fees90 days after location43 CFR 3833.11(a)
BLM yearly maintenance fee (or Small Miner Waiver)September 1 each year. The first one is the first Sept 1 after the date of location.43 CFR 3830.5, 3834.11, 3835
County affidavit of labor, or affidavit of intent to holdNovember 1 every year, whichever BLM path you tookNRS 517.230

The county’s November 1 filing is the record a rival locator or title examiner reads. Our sources did not establish a stated penalty for missing it, so ask the county recorder or the Nevada Division of Minerals before you skip one.

Step by Step

Work through these in order.

Step 1

Stake and Monument the Claim

60 days

Build a monument at the point of discovery. Its size and kind are listed in NRS 517.030 (NRS 517.010(2)).

Then, within 60 days after posting your notice, place a valid legal monument at each corner of the claim (NRS 517.030(1)). A placer claim is marked in the same manner (NRS 517.090).

  • A blazed tree at least 4 inches across and 3 feet above ground, a rock capped to 3 feet, or a post or stone, counts as a monument.
  • Wood post: at least 1½ x 1½ inches by 4 feet, set 1 foot in the ground.
  • Metal post: at least 2 inches by 4 feet, set 1 foot in the ground.
  • Loose stone: at least 6 x 18 inches, with two-thirds of it in a mound 3 feet across and 2½ feet high.

Number the monuments so your map can name them.

Cost: your materials and time.

Step 2

Post the Notice of Location

Post a notice on the monument of location (NRS 517.010(3)). It states:

  • the name of the claim;
  • your name and mailing address;
  • the date of location;
  • for a lode, the feet claimed along the vein each way from the point of discovery, the width on each side of the center, and the general course of the lode;
  • for a placer, the number of feet or acres claimed (NRS 517.090(1)(a)); the claim name must show it is a placer claim (NRS 517.110).

Use a separate notice and certificate for each claim. A combined one is void as to every location except the first described (NRS 517.195).

Cost: $0.

Step 3

Draw the Map and Record With the County Recorder

90 days

Within 90 days, take the recorder of the county where the claim sits duplicate certificates of location and two copies of your location map.

  • The map: two copies, tied to a public land survey corner or a natural or artificial landmark, on sheets 8½ x 14 inches or 24 x 36 inches. You may draw it yourself; a professional surveyor is not required (NRS 517.040(1)). A placer map is drawn at a scale of not less than 500 feet to the inch (NRS 517.100). Drafting standards are in NAC 517.120–517.180.
  • The certificate: a certificate of location, in duplicate. It need not be sworn to and needs no special form (NRS 517.280). A lode certificate gives the claim name, your name and address, the date, the feet claimed and the general course, a statement that the work of location consisted of making the maps, and the location and description of each corner with its markings (NRS 517.050). A placer certificate follows NRS 517.110.
  • The deadline: a lode location is void unless the certificate is recorded within 90 days after the date of location (NRS 517.050(2)). For a placer, the 90-day recording rule is NRS 517.140(1), and NRS 517.290 applies the lode rules to all classes of locations.

Cost: see the Fees section below.

County recorder contacts: find your county recorder’s current address and phone on the county’s own website, and call before you mail anything.

Step 4

File With BLM

90 days

File the claim with BLM within 90 days of location (43 CFR 3833.11(a)). BLM needs the county-recorded certificate, so the county date is the one to work to. MLRS online filing is preferred (mlrs.blm.gov). You can also use the BLM Nevada State Office, 1340 Financial Blvd., Reno, NV 89502, 775-861-6500 (Public Room 8 a.m.–4 p.m. Monday–Friday).

BLM fees are in the Fees section below. You will receive a BLM serial number, which begins with NV for Nevada claims.

Step 5

Keep It Alive Every Year

Sept 1 and Nov 1

With BLM, by September 1 each year, pick one path. The first annual payment is due on the first September 1 after the date of location.

  • Path A: pay the maintenance fee, $200 per lode claim, or $200 per 20 acres or portion per placer claim.
  • Path B: if you hold 10 or fewer claims nationwide (including related parties), file the Small Miner Waiver, BLM Form 3830-002, with no fee. You then do at least $100 of assessment work per claim during the assessment year.

In a waiver year, BLM also wants an affidavit of assessment work by December 30 (Form 3830-004, $15 per claim). For the claim’s first year, a Notice of Intent to Hold by December 30 replaces it (43 CFR 3835.31(c)). If you paid the fee instead, nothing is due to BLM on that date.

With the county recorder, by November 1 every year, whichever BLM path you took (NRS 517.230):

  • In a year labor is required: an affidavit of labor with the amount spent, the kind of work, a description of the claim, the year and dates, the owner, and who did the work (NRS 517.230(1)).
  • In a year you paid the BLM fee instead: an affidavit of intent to hold, with your name and address, the claim name, the date, and a statement that you intend to hold the claim (NRS 517.230(3)). It asks for the BLM serial number, if any.

Fees

BLM fees, schedule effective Sept 1, 2024, confirmed unchanged on the BLM fees page 2026-10-16.

BLM feeAmountNotes
Processing fee$25Per claim
Location fee$49One-time, per claim
Initial maintenance$200 per lode claim
$200 per 20 acres (or portion) per placer claim
Covers the assessment year you located the claim in

Typical total: a new lode claim is $25 + $49 + $200 = $274.

County and state feeAmountLaw
Recorder: certificate of location$10NRS 247.310
Location map filing$15 per lode claim
$1 per acre for a placer
NRS 517.040(2); NRS 517.100(2)
Division of Minerals fee$6 per claimNRS 517.185, NAC 517.200. Collected by the county recorder on certificates and on the yearly affidavit.
Recorder: yearly affidavit$2 for the first claim, $2 each additional claimNRS 247.310(1)

These are the statutory lines only. Counties add general recording fees on top (White Pine publishes $22 and $32 totals), and NRS 247.305 allows further charges whose reach on a mining filing is not settled. Confirm the total with your county recorder before you write a check. Re-check the BLM fees page before every filing.

Where Gold Monster Helps

The Claims Wizard prepares the Nevada filing packet for members: the certificate of location, the map sheet, and the yearly county affidavit, with your deadlines tracked. Membership is $9.99 a month, cancel anytime. See membership

Sources

Also see the Oregon claims guide.